Grajaú II - Sector
Business model
Performance contract
Scope
Vitalux was hired through a bidding process by Sabesp to implement a Loss Reduction program, via a performance contract, covering the Grajaú supply sector and the following actions:
- Implementation of a metal container of 10,000 m³.
- Implementation of 500 m of a 700 mm pipelinemm
- Adaptation of a Treated Water Pumping Plant
- Implementation of booster for high-level zone
- Implementation of 11 Pressure Reducing Valves - PRVs
- Implementation of 13,5 km of networks and interconnections
- Search and Correction of Leaks in 1,300 km of the network
- Repair and replacement of extensions
Benefits
![]() |
Reduction in Water Losses = 4,4 Mi m³/year
|
![]() |
Saved Energy = 3,500 MWh/year
|
Indicators
![]() |
Water available to 27,500 households |
![]() |
Energy available to 1,800 households |
![]() |
Prevented CO2 emissions = 350 tons/year |