Vitalux was hired through a bidding process by Sabesp to implement a Loss Reduction program, via a performance contract, covering the Grajaú supply sector and the following actions:
- Implementation of a metal container of 10,000 m³.
- Implementation of 500 m of a 700 mm pipelinemm
- Adaptation of a Treated Water Pumping Plant
- Implementation of booster for high-level zone
- Implementation of 11 Pressure Reducing Valves - PRVs
- Implementation of 13,5 km of networks and interconnections
- Search and Correction of Leaks in 1,300 km of the network
- Repair and replacement of extensions