Cabuçu WWTP
Business model
Performance contract
Object
Vitalux was hired through a bidding process to supply, install and assist the operations of the sewage treatment system of the Cabuçu/Guarulhos sector.
Scope
Supply and installation of 60 l/s sewage Treatment, covering preliminary, secondary treatments, and mud.
Benefits
![]() |
Sewage Collected and sent to Treatment = 60 l/s
|
Indicators
![]() |
Equivalent to sewage collection in 12,600 households |
![]() |
Prevented CO2 emissions = |