Jandira - Sector
Business model
Performance contract

Scope
- 9 implemented PRVs
- 6.9 Km of network strengthening
- Passage under the CPTM railway – Casing tube
- Leak search
- 8 inspection boxes for DN valves > 300 mm
- Optimization of 15 existing PRVs
Benefits
|
Reduction in Water Losses = 1.1 million m³/year
|
|
|
Saved Energy = 820 MWh/year
|
|
Indicators
| Water available to 6,500 households | |
| Energy available to 420 households | |
| Prevented CO2 emissions = 82 tons/year |