Skip to main content

Jandira - Sector

Business model

Performance contract

Sabesp

Scope
  • 9 implemented PRVs
  • 6.9 Km of network strengthening
  • Passage under the CPTM railway – Casing tube
  • Leak search
  • 8 inspection boxes for DN valves > 300 mm
  • Optimization of 15 existing PRVs
Benefits
Cases TorneiraVerde
Reduction in Water Losses = 1.1 million m³/year
Cases RaioVerde
Saved Energy = 820 MWh/year
   
Indicators
Cases CasaAguaVerde Water available to 6,500 households
Cases CasaEnergiaVerde Energy available to 420 households
Cases CO2Verde Prevented CO2 emissions = 82 tons/year