Skip to main content

França Pinto

Business model

Hybrid Contract: Performance + PEE

logotipo home vitalux 8  ENELlogo aneel pee

Object

Through a Public Call for Projects, Sabesp structured a Project for the França Pinto Unit Plant, with a total investment of R$ 5.3 MM, being part of the resources by the AES Eletropaulo Program (R$ 1.8 MM) and another share as a compensation by Sabesp (R$ 3,5 MM).

Scope

Vitalux was hired through a bidding process by Sabesp, covering the whole administration of the Energy Efficiency Program and with the responsibility of the compensation in the Performance format, which covered the following actions:

  • Substitution of 04 motor pump sets with more efficient ones (450CV)​
  • Installation of a new transformer and electric power panels, with frequency inverter​.
Benefits
Cases RaioVerde
Energy Saved = 6,000 MWh/year
Cases CO2Verde Financial Economy = R$ 1 Mi/year
Indicators
Cases CasaEnergiaVerde
Energy available to 1,100 households
Cases CO2Verde Prevented CO2 emissions = 210 tons/year